Quantcast
breaking news

Brownwood City Council Updated on Wastewater Treatment Plan

By: Lisa Tipton, Brownwoodnews.com
Updated: December 14, 2011
Although still in the planning stages and facing scrutiny by the Texas Commission on Environmental Quality (TCEQ), the City of Brownwood is working to get approval to build a reverse osmosis treatment plant to recycle wastewater into drinking quality water.

Doug Hearn of Hearn Engineering, Inc. presented an outline to the Brownwood City Council Tuesday regarding the process and technology which will be presented to TCEQ on Thursday.  The engineer and staff encouraged questions from the council as well as the public.

Hearn explained that currently, wastewater is treated and disinfected before it is released downstream and is near drinking water quality standards. According to Hearn, this waste water effluent will be taken from the plant and treated with processes of microfiltration, ultraviolet disinfection, reverse osmosis, carbon adsorption and chloramine disinfection to remove any contaminants including microscopic particles, viruses, and even particles on a molecular level, such as salt. The equipment and processes used are proven and have been used in the industry for years according to both Hearn and David Harris, the city's director of public works.

The reverse osmosis plant will process approximately 1.5 million gallons of drinking quality water to be added to Brownwood's dwindling water supply.

According to Hearn, the main obstacle is getting past TCEQ's standard 10 month pilot test which requires the city to build a smaller test plant before the permanent plant design can be approved.  With the lake level so low now due to drought conditions, Hearn stated that time is of the essence.

"If there is only 24 months of water left in the lake, we need to start recycling now, trying to get approval without a pilot test," said Hearn. "They (TCEQ) are worried about raw water. What we are using is disinfected water."

Hearn explained that the 10 month pilot test is required because new water plants are typically built to use raw water as mentioned above and that TCEQ has never had an application for building a plant that utilizes wastewater that is as clean as what Brownwood's effluent is currently. 

Officials hope that the commission can look past the usual protocol and move forward while Brownwood still has an ample water supply in Lake Brownwood for recycling, according to Hearn and Harris.

Harris added that the 10 month pilot test is not needed because the city has effluent water sample data that dates back to 1993 from the treatment plant.

"We could go downstream from the wastewater treatment plant and put that same water through a conventional plant and TCEQ would not say a thing," said Hearn. "That water is more unpredictable and dirtier than what we will be using. We're running our reverse osmosis--exceeding the standards, because everyone is concerned." 

Hearn explained the strategy for Thursday's meeting and hopes to make progress in the process.

"Our position is that this is not the primary water supply, it is a supplemental water source or system. We are trying to augment the city's water supply not replace it, so that is the other reason TCEQ likes to see these pilot tests," explained Hearn. "We are working through a procedure to see how we get from here to turning on the tap. Quite honestly, we need to have this designed built and online by this time next year."

Comments

Readers Feel...

hello
Related Content

Why your regular programming is interrupted by severe weather updates, even though it isn't right outside your window....

Take a close look at your sunscreen this summer. The FDA hopes new labels will make it easier for consumers to choose the best products to protect against the sun....

Heavy winds wreaked havoc across Abilene, leaving many neighborhoods littered with debris....

Summer is just around the corner, and while many are expecting the Texas heat, people also can't forget about their pets...

It seems like the last few weeks have been chocked full of severe weather, and with that severe weather comes cut-ins, which can often come during regular programming. We've heard some complaints to...

The conditions during Thursday night's storm were a bit frightening to witness, as limbs came down, and vehicles were tipped over. .But as KRBC's Nora Hartfeil learned, the severe weather can be for...

The 70's cult classic musical, "The Rocky Horror Picture Show", gained a huge following after its release. Since then, there have been many adaptations including theatre....

Many high school seniors are getting ready to graduate and step into summer vacation. Before that can happen, some are planning to throw a party....

The Abilene Cultural Affairs Council is gearing up for one of its creative season. Their Children's Art and Literacy Festival will transform into the brilliant world of Walter Wick....

The West Texas Rehab Center specializes in many conditions, but one in specific, focuses on the development of a child's head....

 
Find Articles Here
 
      Page 9 of 641
 
Search BigCountryHomepage.com